WHO SHOULD ATTEND
This 3-day Conference Has Been Designed For Job Functions Including:
- CEOS
- COOs
- VPs of Operations
- VPs of Facilities
- VPS of Engineering
- VPs of EHS&R
- Regulatory Directors
- Senior Facilities Engineers
- Production Engineers
- Automation Specialists
- Data Scientists
- Senior Operations Managers
- Production Superintendents
- Facility Engineering Directors
- Environmental Managers
- Automation Leads
Wuendy Abi Assali
Leak Detection Engineer
Chevron
Number of Years in Industry: 29 years
Industry & Academic Experience
- Chevron (8 yrs) Operations, Leak Detection Engineer, Operation, Process Control, Automation, Alarm Management Champion, etc.
- Yokogawa (6 yrs) – Advance Solutions Consultant, Business Development
- Aveva-Telvent (3 yrs) – Simulation Engineer
- University of Maryland (5 yrs) – PhD student, Graduate Assistant, Lecturer
- University of Zulia (3 yrs) – Professor & Researcher
- PDVSA (3 yrs) – Process Control Engineer
Education:
- PhD in Chemical Engineering – University of Maryland
- MSc in Chemical Engineering – University of Zulia
- BSc in Chemical Engineering – University of Zulia
AGENDA HIGHLIGHTS
Hear From Operators, Screened Suppliers And Trusted Manufacturers Bringing A Wealth Of Real World Experience And Technical Information To The Table With No Sales Pitches
DAY ONE & TWO: LINKING EMISSIONS REDUCTION & ESG INTO EFFICIENCY OPTIMIZATION
- Implementing New Technologies & Techniques For GHG Emission Reduction And To Operate The Entire Upstream Facility More Efficiently: Address Fugitive Emissions, Limit Flaring, Capture Gas, Meet Leak Detection Requirements, Evaluate New Vapour Recovery Technology, Update Valve Designs, Improve Compression Efficiency & Carry Out Separation Processing With A Smaller Footprint
- Justifying The Value Of New Emission Reduction Projects For New & Legacy Assets, Operating In Different Situations
- Tankless Systems Versus Conventional Tank Designs
- Optimizing Equipment To Capture & Monetize Product Or Reduce Fuel Burn
- Get Ahead Of New State Regulations Setting The Bar Higher On Flare Reduction & Emissions Reporting
DAY THREE: CASE STUDIES ON FURTHER OPTIMIZING EFFICIENCY TO MAKE MONEY
- Solutions For Optimizing Large Multi-Well Pad Set-Ups & Revisiting Multi-Phase Metering
- Justify Expanding Facilities Automation Projects To Reduce Emissions & Deliver Efficiency Gains
- Sharing Creative Solutions To Address Supply Chain Bottlenecks, Escalating Material Costs & Manpower Shortages
- Case Studies On The Implementation Of Asset Integrity Programmes For Safety-Critical Pressure Vessels & Legacy Equipment With Limited Historical Data